Pre design studies
The design process is generally considered to begin at the concept design stage.
It is preceded by a host of non-design activities, such as business justification, brief development, feasibility studies and options appraisals, and it is followed by design development, technical design, procurement, construction and handover and close out.
Whilst pre-design studies such as feasibility studies and options appraisals may include the prepration of diagrams to assess whether a potential site or building type is possible given the project parameters and constraints, they are not designs. They are intended only to help identify the client's requirements, establish that those requirements are feasible and determine whether the project should proceed in a particular direction.
The concept design represents the design team's initial response to the project brief, and the concept design stage is generally considered to be the most creative stage of a project's development .
For more information see:
- Business justification
- Brief development
- Feasibility studies
- Options appraisals
- Concept design
- Design development
- Technical design
- Procurement
- Construction
- Handover and close out.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.